PennDOT District 11 is announcing construction on the Route 19 (Washington Road) improvement project in Upper St. Clair Township, Allegheny County, will begin Monday, June 10 weather permitting.

Milling and resurfacing will occur on nearly 2.5 miles of Route 19 between Washington County and McMurray Road on this $5.55 million project. The project includes concrete patching, shoulder repairs, base repairs, drainage and guide rail upgrades, ADA curb ramp improvements, signal updates, and sign and pavement marking installation.

Single-lane restrictions in each direction on Route 19 will occur weeknights from 7 p.m. to 6 a.m. beginning Monday night and continuing through late October. Additionally, weekend work requiring lane closures in each direction will occur from Friday night at 7 p.m. continually through 6 a.m. Monday morning. Ten-foot wide lanes will be maintained during construction work.

The prime contractor is A. Folino Construction, Inc. from Oakmont, PA. The overall project is anticipated to be completed in November 2019.

Please use caution if traveling in this area.

Motorists can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 860 traffic cameras.

511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.

Leave a Reply

Your email address will not be published. Required fields are marked *