PennDOT District 11 is announcing pipe replacement work on Route 2067 (Stotler Road) in the Municipality of Penn Hills, Allegheny County, will begin Tuesday, December 5 weather permitting.

Beginning at 7 a.m. Tuesday morning, cross pipe replacement work will occur on Stotler Road between Orchard Drive and Bale Drive. To allow the work to occur, Stotler Road will close to traffic continuously through Sunday, December 31. All traffic will be detoured.

Posted Detour

North of Closure

  • Follow Stotler Road to Route 380 (Saltsburg Road)
  • Turn right onto Route 380 and follow to Universal Road
  • Turn right onto Universal Road and follow back to Stotler Road
  • End detour

South of Closure

  • Same detour in the opposite direction

Allison Park Contractors is the prime contractor.

Motorists can check conditions on more than 40,000 roadway miles, including color-coded winter conditions on 2,900 miles, by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 850 traffic cameras.

511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional twitter alerts accessible on the 511PA website.

Leave a Reply

Your email address will not be published. Required fields are marked *