Know Before You Go!

You’ll save time, avoid congestion, and do your part to clean our air!

The Pennsylvania Department of Transportation (PennDOT) is announcing slide remediation work on Harmony Road (Route 1016) in Daughtery Township, Beaver County will begin Monday, June 1 weather permitting.

Slide remediation work will begin at 7:00 Monday morning and require an around-the-clock closure of a portion of Harmony Road between Blockhouse Run Road and Goehring Road through late June.  Traffic will be detoured.

Posted Detours

West of the Closure

  • From Harmony Road, turn left onto Blockhouse Run Road
  • Turn right onto Allegheny Street
  • Turn left onto 9th Street
  • Turn left onto Route 18
  • Turn left onto 13th Street
  • 13th Street becomes Sunflower Road
  • Sunflower Road becomes Marion Hill Road
  • Turn left onto Route 68 (Sunflower Road)
  • Turn left onto Tulip Drive
  • Follow Tulip Drive back to Harmony Road
  • End detour

East of the Closure

  • Same detour in the opposite direction

Crews from A. Liberoni, Inc. will conduct the slide repair work.

Please stay alert and drive cautiously – safety is everyone’s responsibility.

Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects. Subscribe to PennDOT news and find transportation results in Allegheny, Beaver, and Lawrence counties at www.pa.gov/DOTdistrict11.

Find PennDOT news on X, Facebook, Instagram and LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *