Project Start Date: Fall 2021

Project Completion Date: TBD

Description:

This project within the City of Pittsburgh on several ramps at the I-376 /Boulevard of the Allies/Liberty Bridge (Exit 72B) interchange is expected to begin in the fall of 2021.  Additionally, two mainline Route 885 Boulevard of the Allies bridges are included in the project.  Work will include deck overlays, barrier repairs, expansion dam and bearing replacements, steel repairs, pin and hanger replacements, full painting of the steel superstructures and substructures, deteriorated concrete repairs, downspout replacement and other drainage repairs and concrete repairs to two retaining walls.  Motorists will encounter long-term and off-peak ramp closures, interstate lane restrictions and various local roadway closures throughout this multi-year project.